
Support the project with paypal
| No | Name | Yard No | Builder | Laid down | Launched | Comm | Fate |
|---|---|---|---|---|---|---|---|
| PG2 | Petrel | Columbia Iron Wks, Baltimore | 8.1887 | 13.10.1888 | 12.1889 | stricken 4.1920 |
| Displacement normal, t | 867 |
|---|---|
| Displacement full, t | |
| Length, m | 57.3 |
| Breadth, m | 9.44 |
| Draught, m | 3.50 mean |
| No of shafts | 1 |
| Machinery | 1 HC, 4 cylindrical boilers |
| Power, h. p. | 1000 |
| Max speed, kts | 11.4 |
| Fuel, t | coal 200 |
| Endurance, nm(kts) | |
| Armament | 4 x 1 - 152/35 Mk III, 2 x 1 - 47/40 Hotchkiss Mk I, 1 x 1 - 37/40 Hotchkiss heavy long Mk I, 2 x 5 - 37/20 Hotchkiss |
| Complement | 138 |
Authorized under the Act of 3.3.1885. Originally rigged as a barquentine with no head gear, the mainmast was later removed. Main guns were mounted in sponsons between the forecastle and poop.
1905: - 2 x 5 - 37/20; + 1 x 1 - 37/40 Hotchkiss heavy long Mk I
1911: - 4 x 1 - 152/35; + 4 x 1 - 102/40 Mk III/IV/V/VI
No significant events.

