No | Name | Yard No | Builder | Laid down | Launched | Comm | Fate |
---|---|---|---|---|---|---|---|
PG2 | Petrel | Columbia Iron Wks, Baltimore | 8.1887 | 13.10.1888 | 12.1889 | stricken 4.1920 |
Displacement normal, t | 867 |
---|---|
Displacement full, t | |
Length, m | 57.3 |
Breadth, m | 9.44 |
Draught, m | 3.50 mean |
No of shafts | 1 |
Machinery | 1 HC, 4 cylindrical boilers |
Power, h. p. | 1000 |
Max speed, kts | 11.4 |
Fuel, t | coal 200 |
Endurance, nm(kts) | |
Armament | 4 x 1 - 152/35 Mk III, 2 x 1 - 47/40 Hotchkiss Mk I, 1 x 1 - 37/40 Hotchkiss heavy long Mk I, 2 x 5 - 37/20 Hotchkiss |
Complement | 138 |
Authorized under the Act of 3.3.1885. Originally rigged as a barquentine with no head gear, the mainmast was later removed. Main guns were mounted in sponsons between the forecastle and poop.
1905: - 2 x 5 - 37/20; + 1 x 1 - 37/40 Hotchkiss heavy long Mk I
1911: - 4 x 1 - 152/35; + 4 x 1 - 102/40 Mk III/IV/V/VI
No significant events.