NAVYPEDIA

Support the project with paypal


HOME
FIGHTING SHIPS OF THE WORLD
RUSSIA / USSR
SUBMARINES
B-41 ballistic missile submarines (project 629) (1959 - 1962)


Photo



Project 629A 1978

Ships


Name No Yard No Builder Laid down Launched Comp Fate Modification
Б-92 [B-92], 6.1960- К-96 [K-96], 7.1977- Б-96 [B-96]   801 Northern Wks, Severodvinsk 14.10.1957 16.9.1958 29.12.1959 stricken 9.1987 Project 629
Б-40 [B-40], 6.1960- К-72 [K-72], 7.1977- Б-372 [B-372]   802 Northern Wks, Severodvinsk 16.12.1957 12.4.1959 30.11.1959 stricken 5.1989 Project 629
Б-41 [B-41], 6.1960- К-79 [K-79], 7.1977- Б-79 [B-79]   803 Northern Wks, Severodvinsk 17.2.1958 16.6.1959 25.11.1959 stricken 5.1989 Project 629
Б-42 [B-42], 6.1960- К-83 [K-83], 7.1977- Б-83 [B-83], 8.1979- БС-83 [BS-83]   804 Northern Wks, Severodvinsk 26.4.1958 23.7.1959 29.11.1959 stricken 7.1988 Project 629
Б-121 [B-121], 6.1960- К-102 [K-102], 7.1977- Б-102 [B-102]   805 Northern Wks, Severodvinsk 28.5.1958 19.9.1959 25.12.1959 stricken 7.1980 Project 629
К-107 [K-107] (ex-Б-125 [B-125]), 7.1977- Б-107 [B-107], 8.1978- БС-107 [BS-107]   806 Northern Wks, Severodvinsk 12.11.1958 23.4.1960 17.8.1960 stricken 6.1991 Project 629
К-88 [K-88] (ex-Б-45 [B-45]), 7.1977- Б-183 [B-183]   807 Northern Wks, Severodvinsk 20.11.1958 4.6.1960 15.9.1960 stricken 10.1990 Project 629
К-61 [K-61] (ex-Б-29 [B-29]), 7.1977- Б-167 [B-167], 8.1977- БС-167 [BS-167]   808 Northern Wks, Severodvinsk 20.5.1959 27.8.1960 26.11.1960 stricken 4.1989 Project 629
К-113 [K-113] (ex-Б-146 [B-146]), 7.1977- Б-113 [B-113], 8.1977- БС-113 [BS-113]   809 Northern Wks, Severodvinsk 10.7.1959 17.9.1960 30.11.1960 recharging station 4.1978 Project 629
К-118 [K-118] (ex-Б-149 [B-149]), 7.1977- Б-118 [B-118]   810 Northern Wks, Severodvinsk 22.10.1959 29.9.1960 10.12.1960 recharging station 6.1986 Project 629
К-36 [K-36] (ex-Б-95 [B-95]), 7.1977- Б-106 [B-106]   811 Northern Wks, Severodvinsk 18.3.1960 9.5.1961 31.8.1961 stricken 1.1989 Project 629
К-91 [K-91], 7.1977- Б-91 [B-91]   812 Northern Wks, Severodvinsk 9.8.1960 27.5.1961 23.9.1961 stricken 10.1986 Project 629
К-93 [K-93], 7.1977- Б-93 [B-93]   813 Northern Wks, Severodvinsk 10.10.1960 18.7.1961 16.11.1961 stricken 3.1989 Project 629
К-110 [K-110], 7.1977- Б-110 [B-110], 8.1977- БС-110 [BS-110]   814 Northern Wks, Severodvinsk 1.12.1960 25.8.1961 28.11.1961 stricken 2.1979 Project 629
К-153 [K-153], 7.1977- Б-153 [B-153], 8.1977- БС-153 [BS-153]   815 Northern Wks, Severodvinsk 7.12.1960 27.9.1961 15.12.1961 stricken 9.1990 Project 629
Б-93 [B-93], 6.1960- К-126 [K-126], 7.1977- Б-126 [B-126]   131 Leninskiy Komsomol Yd, Komsomolsk-on-Amur 5.10.1957 16.8.1958 31.12.1959 stricken 6.1988 Project 629
Б-103 [B-103], 6.1960- К-129 [K-129]   132 Leninskiy Komsomol Yd, Komsomolsk-on-Amur 15.3.1958 6.5.1959 31.12.1959 lost 8.3.1968 Project 629
К-136 [K-136] (ex-Б-109 [B-109]), 7.1977- Б-136 [B-136], 8.1977- БС-136 [BS-136]   133 Leninskiy Komsomol Yd, Komsomolsk-on-Amur 19.7.1958 10.9.1959 12.10.1960 stricken 6.1980 Project 629
К-139 [K-139] (ex-Б-113 [B-113]), 7.1977- Б-139 [B-139]   134 Leninskiy Komsomol Yd, Komsomolsk-on-Amur 29.11.1958 12.5.1960 12.12.1960 stricken 4.1990 Project 629
К-75 [K-75] (ex-Б-46 [B-46]), 7.1977- Б-575 [B-575]   135 Leninskiy Komsomol Yd, Komsomolsk-on-Amur 11.4.1959 7.5.1961 16.12.1961 stricken 5.1989 Project 629
К-99 [K-99] (ex-Б-51 [B-51]), 7.1977- Б-99 [B-99]   136 Leninskiy Komsomol Yd, Komsomolsk-on-Amur 31.10.1959 20.8.1961 27.1.1962 stricken 4.1990 Project 629
К-163 [K-163], 7.1977- Б-163 [B-163]   137 Leninskiy Komsomol Yd, Komsomolsk-on-Amur 26.11.1960 7.7.1962 19.12.1962 stricken 9.1987 Project 629
---   138 Leninskiy Komsomol Yd, Komsomolsk-on-Amur // Dalian S Yd, China 1960 1962 1966 // --- completed for China (远征 1101 [Yuanzheng 1101]) Project 629
К-142 [K-142], 7.1977- Б-142 [B-142]   816 Northern Wks, Severodvinsk 20.1.1961 17.9.1961 29.12.1962 stricken 4.1990 Project 629B


Technical data


Displacement standard, t

 

Displacement normal, t

pr. 629: 2850 / 3553

pr. 629B: 2875 / 3553

Length, m

98.9

Breadth, m

8.20

Draught, m

8.10

No of shafts

3

Machinery

3 37D diesels / 1 PG-102 electric motor + 2 PG-101 electric motors

Power, h. p.

6000 / 5400 (2700 + 2x1350)

Max speed, kts

14.5 / 12.5

Fuel, t

diesel oil

Endurance, nm(kts)

16000(8) / 300(2)

Armament

pr. 629, 801, 802, 803: 3 R-11FM SLBM (3 8A61FM), 6 - 533 TT (4 bow, 2 stern, 6)

pr. 629, others: 3 R-13 SLBM (3 4K50), 6 - 533 TT (4 bow, 2 stern, 6)

pr. 629B: 2 R-21 SLBM (2 4K55), 6 - 533 TT (4 bow, 2 stern, 6)

Electronic equipment

Flag radar, MG-200 Arktika-M, Tuloma, Svet sonars, Nakat ECM suite

815, 816: Flag radar, MG-200 Arktika-M, Tuloma, MG-10 Kola, Svet sonars, Nakat ECM suite

Complement

83

Diving depth operational, m

260



Standard scale images


<i>B-41 </i>1959
B-41 1959
<i>B-183 </i>1990
B-183 1990
<i>K-142 </i>1961
K-142 1961
<i>K-36 </i>1968
K-36 1968
<i>K-118 </i>1976
K-118 1976
<i>K-102 </i>1975
K-102 1975
<i>BS-153 </i>1978
BS-153 1978
<i>BS-83 </i>1980
BS-83 1980


Graphics


Project 629A 1978
Project 629A 1978
Project 629R 1978
Project 629R 1978


Project history

This ballistic-missile submarine with Project 641 components was built specifically to fire the new R-13 missile (some boats were equipped for a time with R-11FM carried by converted Project 611. Project 629B was the first submarine to test the submerged-launch missile. Project 629A was the submerged-launch boat with three tubes.

Modernizations

1966, K-88; 1967, K-91, K-129, K-99, K-142; 1969, K-96; 1968, K-79; 1969, K-126; 1970, K-139; 1971, K-93, K-75; 1972, K-72, K-163: - under Project 629A: 2792/3518t, 16500(8)/290(2)nm; armament consisted of 3 R-21 SLBM (3 4K55), 6 - 533 TT (4 bow, 2 stern, 6); sensors consisted of RLK-101 Albatros radar, MG-200 Arktika-M, MG-10 Kola, Svet-M sonars, Nakat-M ECM ECM suite

1967, K-36 - under Project 629A: 2792/3518t, 16500(8)/290(2)nm; armament consisted of 3 R-21 SLBM (3 4K55), 6 - 533 TT (4 bow, 2 stern, 6); sensors consisted of RLK-101 Albatros radar, MG-200 Arktika-M, MG-17, MG-23, MG-10 Kola, Svet-M sonars, Nakat-M ECM ECM suite

1975, K-102 - under Project 605: the hull was lengthened, 3642/4540t, 116.0x8.20x8.10m, 13.7/11.7kts, 8150(8)/132(2.3)nm, compl. 99; armament consisted of 4 R-27K SLBM (4 4K18), 6 - 533 TT (4 bow, 2 stern, 6), sensors consisted of RLK-101 Albatros radar, MG-200 Arktika-M, MG-23, MG-10M Kola sonars, Nakat-KM ECM suite

1976, K-118 - under Project 601: the hull was lengthened, 4160/5180t, 117.6x8.20x8.10m, 13.8/13.5kts, 7300(8)/95(2.3)nm, compl. 98; armament consisted of 6 R-29 SLBM (6 4K75), 6 - 533 TT (4 bow, 2 stern, 6), sensors consisted of RLK-101 Albatros radar, MG-200 Arktika-M, MG-23, MG-10 Kola sonars, Nakat-M ECM suite, Alfa-2 CCS

1976, B-167; 1977, B-107; 1979, BS-83 - under Project 629R: 3 R-13 SLBM, 2 - 533 TT (stern); + communication equipment

1978, BS-153 - under Project 619: 2820/3090t, 98.9x8.20x8.00m, 15.5/12.5kts, compl. 59; armament consisted of 1 R-39 SLBM (1 3M65), 6 - 533 TT (4 bow, 2 stern 6)

Naval service

K-129 was lost by unknown cause 8.3.1968 off Hawaii.