NAVYPEDIA

Support the project with paypal


HOME
FIGHTING SHIPS OF THE WORLD
INDIA
ESCORTS
TALWAR frigates (2003-2013)


Photo



Tabar 2006

Ships


Name No Yard No Builder Laid down Launched Comp Fate
तलवार [Talwar] (ex-Дозорный [Dozornyy]) F40   Baltiyskiy SSZ, St. Petersburg, Russia 10.3.1999 12.5.2000 19.3.2002 // 18.6.2003 in service (2019)
त्रिशूल [Trishul] (ex-Ударный [Udarnyy]) F43   Baltiyskiy SSZ, St. Petersburg, Russia 24.9.1999 24.11.2000 2002 // 25.6.2003 in service (2019)
टाबर [Tabar] (ex-СКР-23 [SKR-23]) F44   Baltiyskiy SSZ, St. Petersburg, Russia 26.5.2000 25.5.2001 2004 // 19.4.2004 in service (2019)
तेग [Teg] F45   Yantar', Kaliningrad, Russia 27.7.2007 27.11.2009 27.4.2012 in service (2019)
तरकश [Tarkash] F50   Yantar', Kaliningrad, Russia 27.11.2007 23.6.2010 9.11.2012 in service (2019)
त्रिकांड [Trikand] F51   Yantar', Kaliningrad, Russia 11.6.2008 25.5.2011 29.6.2013 in service (2019)
vii (ex-Адмирал Бутаков [Admiral Butakov])     Yantar', Kaliningrad, Russia 13.7.2013 5.3.2016 2022 building (2019)
viii (ex-Адмирал Истомин [Admiral Istomin])     Yantar', Kaliningrad, Russia 15.11.2013 16.11.2017 2022 building (2019)


Technical data


Displacement standard, t

3100

Displacement full, t

F40, 43,44: 4000

F45, 50, 51: 4035

Length, m

116.9 pp 124.8 oa

Breadth, m

15.2

Draught, m

4.20 hull 7.30 sonar dome

No of shafts

2

Machinery

COGAG: 2 Zoria-Mashproekt UGT-6000 (DS-71) gas turbines + 2 Zoria-Mashproekt UGT-16000 (DT-59) gas turbines

Power, h. p.

18000 + 39000 = 59840

Max speed, kts

32

Fuel, t

gas turbine oil 800

Endurance, nm(kts)

4600(20)

Armament

F40, 43, 44: 1 x 8 Club-N SSM (VLS, 8 3M-54E), 1 x 1 Shtil SAM (24 9M317), 2 x (8 Kashtan SAM + 2 x 6 - 30/54) Kashtan CIWS (64 9M311), 1 x 1 - 100/59 A-190, 2 x 2 - 533 DTA-53 TT (SET-65E, 53-65KE), 1 x 12 RBU-6000 ASWRL, 1 helicopter (Ka-28 or Ka-31)

F45, 50, 51: 1 x 8 BrahMos CruM-SSM (VLS, 8 PJ-10), 1 x 1 Shtil SAM (24 9M317), 1 x 1 - 100/59 A-190, 2 x 6 - 30/54 AK-630, 2 x 2 - 533 DTA-53 TT (SET-65E, 53-65KE), 1 x 12 RBU-6000 ASWRL, 1 helicopter (Ka-28 or Ka-31)

Electronic equipment

F40, 43, 44: MR-710AE Fregat-MAE, 3Ts-25EK, 2x MR-212/201-1 Vaygach-U, Nucleus-2-6000A, 4x MR-90E, MR-352 Pozitiv, 5P-10E Puma radars, HUMSA, SSN-137 sonars, ASOR-11356, Ajanta ECM suites, 4x PK-10 Smelyy decoy RL, Trebovaniye-M CCS

F45, 50, 51: MR-760MA Fregat-M2EM, 3Ts-25EK, 2x MR-212/201-1 Vaygach-U, Nucleus-2-6000A, 4x MR-90E, MR-352 Pozitiv, 5P-10E Puma radars, HUMSA, SSN-137 sonars, ASOR-11356, Ajanta ECM suites, 4x PK-10 Smelyy decoy RL, Trebovaniye-M CCS

Complement

180



Standard scale images


<i>Talwar </i>2010
Talwar 2010


Graphics


<i>Tabar </i>2006
Tabar 2006


Project history

Government approval for construction of the first three was given in 1998, and a contract was signed in 1997; the Russian yard delays were reportedly due to misappropriation of the $64-million advance payment by India. Indian designation is Project 17A. Delivery of the Talwar was delayed further because of hull cracking below the waterline, both on builder's trials and again during owner's sea trials. Problems with the Shtil missile system integration caused additional delays, though the first vessel was turned over to the Indian Navy in 2003. Plans to build three improved (Batch II) units were approved in 1999 and the order was placed with Russia in 2006. The Batch II units (F 45, F 46, and F 50) carry Brahmos PJ-10 antiship/land-attack missiles in place of the 3M-54E Club-N missiles and carry twin AK-630M 30mm CIWS systems but no Kashtan SAMS. Hull and propulsion system are similar to the 1960s-vintage project 11356, with forecastle extended further aft. Entirely new superstructure, shaped to reduce the radar return. The Indian Navy describes the design as having "partial stealth" capabilities.

In 2019 building of four more ships was announced. Two of them were built originally for Russian Black Sea Fleet but their building was suspended when Ukraine declared war to Russia (ships had to had Ukrainian engines). Indinan party reordered these ships for own navy. Ships will be completed in Russia, Ukrainian gas turbines will be delivered to Kaliningrad. Two more ships will be built in Goa with Russian assistance.

Modernizations

None.

Naval service

No significant events.