No | Name | Yard No | Builder | Laid down | Launched | Comm | Fate |
---|---|---|---|---|---|---|---|
TB6 | Porter | 184 | Herreshoff, Bristol | 2/1896 | 9.9.1896 | 2/1897 | stricken 11.1912 |
TB7, 8.1918- CTB3 | DuPont, 8.1918- unnamed | 185 | Herreshoff, Bristol | 2/1896 | 30.3.1897 | 9/1897 | sold 7.1920 |
Displacement normal, t | 165 |
---|---|
Displacement full, t | |
Length, m | 53.5 |
Breadth, m | 5.41 |
Draught, m | 1.42 mean |
No of shafts | 2 |
Machinery | 2 VQE, 3 Normand boilers |
Power, h. p. | 3200 |
Max speed, kts | 27.5 |
Fuel, t | coal 76 |
Endurance, nm(kts) | |
Armament | 4 x 1 - 37/40 Driggs-Schroeder heavy Mk I, 3 x 1 - 450 TT |
Complement | 24 |
Authorised under the Act of 2.3.1895. Three funnels, the second and third far apart. Three single TT, to port and starboard of forward funnels and far aft.
None.
No significant events.