No | Name | Yard No | Builder | Laid down | Launched | Comm | Fate |
---|---|---|---|---|---|---|---|
LCAC100 | Textron, New Orleans | 11.2014 | 2010 | building (2018) | |||
LCAC101 | Textron, New Orleans | 11.2014 | 2010 | building (2018) | |||
LCAC102 | Textron, New Orleans | 11.2014 | 2010 | building (2018) | |||
LCAC103 | Textron, New Orleans | 11.2014 | 2010 | building (2018) | |||
LCAC104 | Textron, New Orleans | 11.2014 | 2020 | building (2018) | |||
LCAC105 | Textron, New Orleans | 11.2014 | 2020 | building (2018) | |||
LCAC106 | Textron, New Orleans | 11.2014 | 2020 | building (2018) | |||
LCAC107 | Textron, New Orleans | 11.2014 | 2020 | building (2018) | |||
LCAC108 | Textron, New Orleans | 11.2014 | 2020 | building (2018) | |||
LCAC109 | Textron, New Orleans | 11.2014 | 2020 | building (2018) |
Displacement standard, t | 101 |
---|---|
Displacement full, t | 181 |
Length, m | 24.5 wl 28.0 oa |
Breadth, m | 13.3 wl 14.5 oa |
Draught, m | 1.42 at rest, loaded / 0 |
No of shafts | 2 shrouded airscrews + 4 centrifugal lift fans |
Machinery | 4 Rolls-Royce MT7 gas turbines (2 for propulsion, 2 for lift) |
Power, h. p. | 20000 |
Max speed, kts | 45 light, 35 loaded |
Fuel, t | gas turbine oil |
Endurance, nm(kts) | |
Armament | 2 x 1 - 7.6/92 |
Military load | 70 t cargo, 26 troops |
Electronic equipment | Furuno 2127 radar |
Complement | 5 |
Planned replacement for LCAC with more powerful turbines. 74 units are planned to be commissioned in 2019-2031.
.
.
© Ivan Gogin, 2017-19