
Support the project with paypal
| Name | No | Yard No | Builder | Laid down | Launched | Comm | Fate |
|---|---|---|---|---|---|---|---|
| Володимир Великий [Volodimir Velikiy] | 01701 | Chernomorskiy SBZ, Nikolayev | 17.5.2011 | 2023 | building (2020) |
| Displacement standard, t | 2500 |
|---|---|
| Displacement full, t | 2650 |
| Length, m | 112.0 |
| Breadth, m | 13.5 |
| Draught, m | 3.50 |
| No of shafts | 2 |
| Machinery | CODOG: 2 Zoria-Mashproekt gas turbines / 2 Caterpillar diesels |
| Power, h. p. | |
| Max speed, kts | 32 |
| Fuel, t | diesel / gas turbine oil |
| Endurance, nm(kts) | 4000(12) |
| Armament | 2 x 4 MM40 Exocet SSM (8 MM40 Block 3), 1 x 16 Sylver A43 SAM (VLS, 16 Aster-15), 1 x 1 - 76/62 OTO-Melata Compact SR, 2 x 1 - 35/90 Millenium, 2 x 1 - 12.7/79, 2 x 3 - 324 B515 TT (MU90 or A244), 1 helicopter (Ka-27 or NH90) |
| Electronic equipment | nav., air search, fire control radars, hull-mounted, towed sonars, ECM suite, type 2170 SSTDS torpedo decoy, decoy RL, CCS |
| Complement | 110 |
Ukrainian project 58250. Originally a class of 10-12, later 6-8 and then 4 ships was planned but only lead ship was really commenced by building. Ship is built very slow due lack of funds. In 2019 building of 32%-completed ship was again suspended.
None.
No significant events.

