Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
БТ-3 [BT-3], 5.1966- БТ-225 [BT-225] | 201 | Avangard, Petrozavodsk | 1965 | stricken 1984 | |||
БТ-120 [BT-120], 5.1966- БТ-126 [BT-126] | 202 | Avangard, Petrozavodsk | 1966 | stricken 1983 | |||
БТ-101 [BT-101] | 203 | Avangard, Petrozavodsk | 1967 | stricken 1983 | |||
БТ-309 [BT-309] | 204 | Avangard, Petrozavodsk | 1967 | stricken 1980s | |||
БТ-192 [BT-192] | 205 | Avangard, Petrozavodsk | 1968 | stricken 1980s |
Displacement standard, t | 276 |
---|---|
Displacement full, t | 300 |
Length, m | 41.0 |
Breadth, m | 8.00 |
Draught, m | 2.28 |
No of shafts | 2 |
Machinery | 2 M-503B diesels |
Power, h. p. | 5000 |
Max speed, kts | 16.5 |
Fuel, t | diesel oil |
Endurance, nm(kts) | 1000(12) |
Armament | 1 x 2 - 30/71 AK-230M, 2 DCR (27), 8 - 12 mines, TS-1 or BKT mechanical or PEMT-4 or ST-2 magnetic or AT-3 or PAUT acoustic minesweeping gear or 2 200m mine clearing line charges |
Electronic equipment | Donets-2 radar, MG-69 Lan' sonar |
Complement | 22 |
Project 699 was an improved version of Project 257, built in small numbers, powered by two 2500bhp diesels rather than 1200bhp lightweight high-speed diesels of the Project 257. They made it possible for the ship to tow heavier sweeps such as barge-sweeps (as against pressure mines) and twin bottom contact sweeps.
None.
No significant events.