Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate | Modification |
---|---|---|---|---|---|---|---|---|
Дозорный [Dozornyy] | 301 | Baltiyskiy SSZ, St. Petersburg | 10.3.1999 | 12.5.2000 | 19.3.2002 | to India 6.2003 (तलवार [Talwar]) | Project 11356I | |
Ударный [Udarnyy] | 302 | Baltiyskiy SSZ, St. Petersburg | 24.9.1999 | 24.11.2000 | 2002 | to India 6.2003 (त्रिशूल [Trishul]) | Project 11356I | |
СКР-23 [SKR-23] | 303 | Baltiyskiy SSZ, St. Petersburg | 26.5.2000 | 25.5.2001 | 2004 | to India 4.2004 (टाबर [Tabar]) | Project 11356I | |
Адмирал Григорович [Admiral Grigorovich] | 494 | 01357 | Yantar', Kaliningrad | 18.12.2010 | 14.3.2014 | 10.3.2016 | in service (2019) | Project 11356 |
Адмирал Эссен [Admiral Essen] | 490 | 01358 | Yantar', Kaliningrad | 8.7.2011 | 7.11.2014 | 31.5.2016 | in service (2019) | Project 11356 |
Адмирал Макаров [Admiral Makarov] | 499 | 01359 | Yantar', Kaliningrad | 29.2.2012 | 2.9.2015 | 25.12.2017 | in service (2019) | Project 11356 |
Адмирал Бутаков [Admiral Butakov] | 01360 | Yantar', Kaliningrad | 12.7.2013 | 2.3.2016 | --- | building for India (2019) | Project 11356 | |
Адмирал Истомин [Admiral Istomin] | 01361 | Yantar', Kaliningrad | 15.11.2013 | 11/2017 | --- | building for India (2019) | Project 11356 | |
Адмирал Корнилов [Admiral Kornilov] | 01362 | Yantar', Kaliningrad | 12/2013 | 11/2017 | --- | building for India (2019) | Project 11356 |
Displacement standard, t | 3350 |
---|---|
Displacement full, t | 3860 |
Length, m | 124.8 |
Breadth, m | 15.2 |
Draught, m | 4.66 hull 7.50 max |
No of shafts | 2 |
Machinery | COGAG M7N1: 2 M70 cruising gas turbines + 2 DT-59 boost gas turbines |
Power, h. p. | 12000 + 34000 = 46000 |
Max speed, kts | 30 |
Fuel, t | gas turbine oil 800 |
Endurance, nm(kts) | 4850(14) |
Armament | pr. 11356I: 1 x 8 Club-N SSM (VLS, 8 3M54TE), 1 x 1 Shtil-1 SAM (24 9M317E), 2 x (8 Kashtan SAM + 2 x 6 - 30/54) Kashtan CADS (64 9M311E), 8 x 1 Igla-1E SAM (8 Igla-1E), 1 x 1 - 100/59 A-190E, 2 x 1 - 12.7/79, 2 x 2 - 533 TT, 1 x 12 RBU-6000 RPK-8E ASWRL, 2 x 10 - 55 DP-65 grenade launchers, 1 helicopter (Ka-28) pr. 11356: 1 x 8 Kalibr-NK CruM/SSM (VLS, 8 3M14/3M54), 2 x 12 Shtil-1 SAM (VLS, 24 9M317), 1 x 1 - 100/59 A-190-01, 2 x 6 - 30/54 AK-630M, 2 x 1 - 12.7/79, 2 x 2 - 533 TT, 1 x 12 RBU-6000 RPK-8E ASWRL, 2 x 10 - 55 DP-65 grenade launchers, 1 helicopter (Ka-31) |
Electronic equipment | pr. 11356I: MR-710AE Fregat-MAE, 3Ts-25EK, MR-212/201-1 Vaygach-U, BridgeMaster, Nucleus-2-6000A, 2x MR-90E, 5P-10E Puma radars, Humsa, SSN-137 sonars, ASOR-11356 ECM suite, 4x PK-10 Smelyy decoy launchers, Trebovaniye-M CCS pr. 11356: MR-710 Fregat-M, 3Ts-25EK, MR-212/201-1 Vaygach-U, Nucleus-2-6000A, 4x MR-90 Orekh, 5P-10 Puma radars, MGK-335EM-03 Platina sonar suite, TK-25 ECM suite, 4x PK-10 Smelyy decoy launchers, Trebovaniye-M CCS |
Complement | 220 |
First three frigates of Talwar class were built under Indian order, three more frigates built by Yantar' in 2012-2014 were directly commissioned by Indian Navy. Due to delay with completing of new frigates of project 22350 it was decided in 2009 to build near-copies of Indian ships with slightly modified armament (Kalibr missiles and SAM VLS) for Black Sea Fleet. Three ships were ordered in October 2010 and three more in September 2011.
Hull and propulsion system are similar to the earlier project 1135 from 1970s with forecastle extended aft and new superstructure shaped to reduce radar interference.
The 2014 coup in Ukraine, committed by nazi anti-Russian forces, led to a complete rupture of economic relations between Ukraine and Russia. As a result, completion of three frigates of the second group (Admiral Butakov, Admiral Istomin and Admiral Kornilov) became impossible in the near future, as gas turbines for them were produced by "Zarya-Mashproekt" in Nikolaev. India ordered the completion of these three ships for own navy. Ukraine does not refuse to deliver engines to Russia under Indian order.
None.
No significant events.
2016