NAVYPEDIA

Support the project with paypal


HOME
FIGHTING SHIPS OF THE WORLD
PAKISTAN
SUBMARINES
HANGOR submarines


Ships


Name No Yard No Builder Laid down Launched Comp Fate
ہنگور [Hangor]     Wuchang, Wuhan, China     2022 building (2019)
ii     Wuchang, Wuhan, China     2022 building (2019)
iii     Wuchang, Wuhan, China     2023 building (2019)
iv     Wuchang, Wuhan, China     2023 building (2019)
v     KSEW, Karachi     2027 building (2019)
vi     KSEW, Karachi     2027 building (2019)
vii     KSEW, Karachi     2028 building (2019)
viii     KSEW, Karachi     2028 building (2019)


Technical data


Displacement standard, t

 

Displacement normal, t

2725 / 3600

Length, m

77.6

Breadth, m

8.40 hull

Draught, m

5.50

No of shafts

1

Machinery

4 MTU 16V396 SE 83/84 diesel-generators / Stirling AIP, 1 electric motor

Power, h. p.

6092 / 220

Max speed, kts

16 / 23

Fuel, t

diesel oil

Endurance, nm(kts)

8000(16) / 800(4)

Armament

6 - 533 TT (bow, 18, inc. Yin Ji-82 SSM (4 C-602) or 24-36 mines)

Electronic equipment

type 359 radar, H/SQG-4 sonar suite (TSM2233 Eledone, TSM-2255, SQB-2 sonars), H/SQC-207 sonar, Type 921-A (SRW209) ECM suite, CCS

Complement

58

Diving depth operational, m

300



Standard scale images


<i>Hangor</i>
Hangor


Project history

Chinese type 039B upgraded. Ordered 27.8.2016. Stirling AIP system was developed by Chinese No711 Institute. Submarines presumably will can carry Babur III strategic cruise missiles.

Modernizations

None.

Naval service

No significant events.