Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
ضرر [Zarrar] | P03 | Yonca-Onuk, Tuzla, Turkey | 26.11.2007 | in service (2019) | |||
قرار [Karrar] | P04 | Yonca-Onuk, Tuzla, Turkey | 11.4.2008 | in service (2019) |
Displacement standard, t | |
---|---|
Displacement full, t | 124 |
Length, m | 33.0 pp 35.6 oa |
Breadth, m | 6.70 |
Draught, m | 1.40 |
No of shafts | 3 waterjets |
Machinery | CODAG: 1 Honeywell TF50 gas turbine + 2 MTU 12V4000 M90 diesels |
Power, h. p. | 7400 |
Max speed, kts | 60 |
Fuel, t | diesel oil |
Endurance, nm(kts) | 850(36) |
Armament | 2 x 2 Harpoon SSM (4 RGM-84C, provision for), 2 x 1 - 12.7/90 |
Electronic equipment | Raytheon radar |
Complement | 20 |
Turkish Kaan 33 (MRTP 33) design. Built using composites, carry a small stern-launched RIB.
None.
No significant events.