Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
အင်းလေ [Inlay] | 54 | Thanlyin SY, Yangon | 27.11.2015 | 24.12.2017 | in service (2019) |
Displacement standard, t | |
---|---|
Displacement full, t | 1500 |
Length, m | 81.0 |
Breadth, m | 12.5 |
Draught, m | |
No of shafts | 2 |
Machinery | 2 diesels |
Power, h. p. | |
Max speed, kts | |
Fuel, t | diesel oil |
Endurance, nm(kts) | |
Armament | 1 x 2 - 57/70 type 76, 1 helicopter (Z-9) |
Electronic equipment | 2x radars |
Complement |
Built with technical assistance of Singapore. Fast boarding RIB is carried on the stern ramp.
None.
No significant events.