Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
Maharaja Lela | 2501 | Boustead NS, Lumut | 8.3.2016 | 24.8.2017 | 2019 | building (2019) | |
Syarif Masahor | 2502 | Boustead NS, Lumut | 28.2.2017 | 2019 | 2019 | building (2019) | |
Raja Mahadi | 2503 | Boustead NS, Lumut | 18.12.2017 | 2020 | building (2019) | ||
Mat Salleh | 2504 | Boustead NS, Lumut | 31.10.2018 | 2021 | building (2019) | ||
Tok Janggut | 2505 | Boustead NS, Lumut | 2022 | planned (2019) | |||
Mat Kilau | 2506 | Boustead NS, Lumut | 2023 | planned (2019) |
Displacement standard, t | 2730 |
---|---|
Displacement full, t | 3000 |
Length, m | 107.0 pp 111.0 oa |
Breadth, m | 16.0 |
Draught, m | 5.10 over sonar |
No of shafts | 2 waterjets |
Machinery | 4 MTU 20V1163 M94 diesels |
Power, h. p. | 39700 |
Max speed, kts | 28 |
Fuel, t | diesel oil |
Endurance, nm(kts) | 5000(15) |
Armament | 2 x 4 MM40 Exocet Block III SSM (8 MM40 Block III) or 2 x 4 NSM SSM (8 NSM), 1 x 8 VL MICA SAM (VLS, 8 MICA) or 1 x 16 MICA SAM (VLS, 16 MICA), 1 x 1 - 57/70 SAK-57 Mk 3, 2 x 1 - 30/75 DS-30B, 2 x 1 - 12.7/90, 2 x 2 - 324 TT (4 MU90), 1 helicopter (EC725) |
Electronic equipment | SMART-S Mk 2, nav., appoint, 2x TMX-EO3 radars, TM-EO2 e/o system, Captas-2 sonar, Vigile ECM suite, laser detector, 2x SuperBarricade or 2x Sylena Mk 2 decoy RL, SETIS CCS |
Complement | 106 |
Authorized in February 2011 under the SGPV-LCS (Second Generation Patrol Vessel - Littoral Combat Ship) program. In December 2011 Gowind 2500 design become a winner in competition with 2nd series of MEKO A100 design (Kedah class).
None.
No significant events.