Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
おやしお [Oyashio] | SS590, 3.2015- TSS3608 | Kawasaki, Kobe | 26.1.1994 | 15.10.1996 | 16.3.1998 | TS 3.2015, in service (2019) | |
みちしお [Michishio] | SS591, 2.2017- TSS3609 | Mitsubishi, Kobe | 16.2.1995 | 18.9.1997 | 10.3.1999 | TS 2.2017, in service (2019) | |
うずしお [Uzushio] | SS592 | Kawasaki, Kobe | 6.3.1996 | 26.11.1998 | 9.3.2000 | in service (2019) | |
まきしお [Makishio] | SS593 | Mitsubishi, Kobe | 26.3.1997 | 22.9.1999 | 29.3.2001 | in service (2019) | |
いそしお [Isoshio] | SS594 | Kawasaki, Kobe | 9.3.1998 | 27.11.2000 | 14.3.2002 | in service (2019) | |
なるしお [Narushio] | SS595 | Mitsubishi, Kobe | 2.4.1999 | 4.10.2001 | 3.3.2003 | in service (2019) | |
くろしお [Kuroshio] | SS596 | Kawasaki, Kobe | 27.3.2000 | 23.10.2002 | 8.3.2004 | in service (2019) | |
たかしお [Takashio] | SS597 | Mitsubishi, Kobe | 30.1.2001 | 1.10.2003 | 9.3.2005 | in service (2019) | |
やえしお [Yaeshio] | SS598 | Kawasaki, Kobe | 15.1.2002 | 4.11.2004 | 9.3.2006 | in service (2019) | |
せとしお [Setoshio] | SS599 | Mitsubishi, Kobe | 23.1.2003 | 5.10.2005 | 28.2.2007 | in service (2019) | |
もちしお [Mochishio] | SS600 | Kawasaki, Kobe | 23.2.2004 | 6.11.2006 | 6.3.2008 | in service (2019) |
Displacement standard, t | 2750 |
---|---|
Displacement normal, t | / 3500 |
Length, m | 81.7 |
Breadth, m | 8.9 wl 10.3 hull |
Draught, m | 7.90 |
No of shafts | 1 |
Machinery | 2 Kawasaki-MAN 12V25/25S diesel-generators, 2 Toshiba Electric electric motors |
Power, h. p. | 5520 / 7750 |
Max speed, kts | 12 / 20 |
Fuel, t | diesel oil |
Endurance, nm(kts) | 7000(8) / 500(4) |
Armament | 6 - 533 HU-603B TT (bow, 20, inc/ Sub-Harpoon SSM (4 UGM-84)) |
Electronic equipment | ZPS-6D radar, ZQQ-6B, ZQR-1 sonars, ZLA-7 or ZLR-3 ECM suite, ZYQ-3 CCS |
Complement | 61 |
Diving depth operational, m | 400 |
An entirely new design, with SS590 approved under the 1993 budget. The casing above the pressure hull is much higher than in previous Japanese designs and is tapered downward at the bow to accommodate the bow-mounted torpedo tubes and chin sonar array. The outer hull has an anechoic coating on the sides, but not on the bottom. The towed hydrophone array is housed at the aft end of the casing. There are two conformal flank passive hydrophone arrays, the upper running nearly the full length of the submarine and the lower, shorter one running from just forward of the sail to roughly amidships.
None.
No significant events.