Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
جماران [Jamaran] | 76 | Bandar Abbas | 2004 | 28.11.2007 | 19.2.2010 | in service (2019) | |
دماوند [Damavand] | 77 | Shahid Tamijidi Marine Industries, Bandar Anzali | 2009 | 15.3.2013 | 9.3.2015 | wrecked 10.1.2018 | |
سهند [Sahand] | 74 | Bandar Abbas | 2010 | 8/2015 | 1.12.2018 | in service (2019) | |
شیراز [Shiraz] | 75 | Bandar Abbas | 2012 | 8/2015 | 2020 | building (2019) | |
78 | Khoramshahr SY | 2012 | 2018 | 2021 | building (2019) | ||
80 | Khoramshahr SY | 2013 | 2019 | 2022 | building (2019) |
Displacement standard, t | 1200 |
---|---|
Displacement full, t | 1500 |
Length, m | 88.0 pp 94.5 oa |
Breadth, m | 11.1 |
Draught, m | 4.30 |
No of shafts | 2 |
Machinery | 2 SEMT-Pielstick diesels |
Power, h. p. | 20000 |
Max speed, kts | 30 |
Fuel, t | diesel oil |
Endurance, nm(kts) | 3650(17) |
Armament | 76: 2 x 2 Noor SSM (4 C-802), 2 x 2 Standard SM-1 MR SSM (4 RGM-66D), 1 x 1 - 76/62 OTO-Melara Compact, 1 x 1 - 40/70 Bofors 564, 2 x 1 - 20/90 GAM-B01, 2 x 1 - 12.7/90, 2 x 3 - 324 Mk 32 TT, helicopter deck 77 and others: 2 x 2 Ghader SSM (4 C-802), 2 x 2 Standard SM-1MR SSM (4 RGM-66D), 1 x 1 - 76/62 OTO-Melara Compact, 1 x 1 - 40/70 Bofors 564, 2 x 1 - 20/90 GAM-B01, 2 x 1 -1 2.7/90, 2 x 3 - 324 Mk 32 TT, helicopter deck |
Electronic equipment | 76: AWS-1, Decca 1226, nav., Sea Hunter radars, RDL-2AC ECM suite,2 x decoy RL 77 and others: Asr, Decca 1226, nav., Sea Hunter, WM-28 radars, FLIR e/o system, RDL-2AC ECM suite,2 x decoy RL |
Complement | 125 |
Mowj project became a development of Vosper Mk 5 (Alvand-class) design. Sahand and later ships have stealth superstructures forms.
2013, Jamaran: - AWS-1 radar; + Asr radar
Damavand ran ashore 10.1.2018 off Bandar Anzali (Caspian Sea) and was completely destroyed by a storm.