Name | No | Yard No | Builder | Laid down | Launched | Comm | Fate |
---|---|---|---|---|---|---|---|
ADRI LI | PT Daya Radar Utama, Lamongan | 23.3.2019 | 2019 | building (2019) | |||
ADRI LII | PT Daya Radar Utama, Lamongan | 2019 | 2020 | building (2019) |
Displacement standard, t | 1500dwt |
---|---|
Displacement full, t | ~4000 |
Length, m | 99.2 |
Breadth, m | 16.4 |
Draught, m | |
No of shafts | 2 |
Machinery | 2 diesels |
Power, h. p. | |
Max speed, kts | 14 |
Fuel, t | diesel oil |
Endurance, nm(kts) | |
Armament | none |
Military load | tanks |
Electronic equipment | radar |
Complement |
Logistic landing craft. Has bow ramp and can be beached.
None.
No significant events.