Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
चक्र [Chakra] (ex-К-152 Нерпа [K-152 Nerpa]) | S71 | 518 | Amur Yd, Komsomolsk-on-Amur, Russia | 1993 | 30.6.2006 | 28.10.2009 // 4.4.2012 | in service (2019) |
Displacement standard, t |
|
---|---|
Displacement normal, t | 8167 / 10500 |
Length, m | 110.3 |
Breadth, m | 13.8 hull 15.4 max |
Draught, m | 9.88 |
No of shafts | 1 |
Machinery | 1 OK-9VM geared steam turbines unit, OK-650VM nuclear reactor |
Power, h. p. | 50000 |
Max speed, kts | 11.2 / 33.3 |
Fuel, t | nuclear |
Endurance, nm(kts) | practically unlimited |
Armament | 4 - 650 TT (0), 4 - 533 TT (36, inc. Club-S SSM), 1 x 1 Strela-3M SAM (16 9M36) |
Electronic equipment | MRKP-59 Radian-U radar, MGK-540 Skat-3 sonar suite, MG-519 Arfa, MG-512 Vint-M sonars, MRP-21A ECM suite, 6 REPS-324 Shlagbaum decoy launchers, MVU-132 Omnibus CCS |
Complement | 73 |
Diving depth operational, m | 480 |
Negotiations with Russia for a 10-year "lease with the option to buy" of a Project 971 nuclear-powered attack submarine have reportedly been under way since at least 1999. Though initially rejected by India, negotiations on the lease of up to two submarines were soon renewed between the two nations due to slippages in development and construction of the Indian ATV program. By late 2005, 300 Indian naval personnel had arrived in Russia to begin training for future service aboard the submarine Nerpa. The program suffered a major setback during November 2008 when the Nerpa was undergoing trials prior to its turnover to India. A fire extinguishing system on board the vessel malfunctioned, killing 20 Russian members of the crew and injuring many others. This placed an indefinite hold on the boat's transfer, which was not finalized until September 2011 with the submarine arriving in Indian waters during October. Submarine was reconstructed under special export project 971I before transfer: 650mm weapon all were landed, but 533mm ammunition stowage was enlarged. Wake detector wasn't installed.
None.
In December 2017 Chakra suffered bad damage entering Visakhapatnam harbour and entered dock for repair.