Name | No | Yard No | Builder | Laid down | Launched | Comm | Fate |
---|---|---|---|---|---|---|---|
Κεφαλληνία [Kethallinia] (ex-МДК-118 [MDK-118]) | L180 | Almaz, St. Peterburg, Russia | 29.8.1994 // 20.12.2000 | in service (2019) | |||
Ιθάκη [Ithaki] (ex-Iван Богун [Ivan Bogun]) | L181 | More, Feodosia, Ukraine | 1993 | 9.12.2000 | 3.2.2001 // 17.2.2001 | in service (2019) | |
Κέρκυρα [Kerkira] | L182 | Almaz, St. Peterburg, Russia | 24.1.2003 | 25.7.2004 | 4.1.2005 | in service (2019) | |
Ζάκυνθος [Zakynthos] | L183 | Almaz, St. Peterburg, Russia | 25.5.2000 | 28.5.2001 | 2001 | in service (2019) |
Displacement standard, t | 500 |
---|---|
Displacement normal, t | 550 |
Length, m | 57.3 |
Breadth, m | 25.6 |
Draught, m | 1.60 / 0.00 |
No of shafts | 3 air propellers / 2 air propellers for lift |
Machinery | 3 MT-70 gas turbines / 2 NO-10 gas turbines |
Power, h. p. | 30000 / 20000 |
Max speed, kts | 63 |
Fuel, t | gas turbine oil |
Endurance, nm(kts) | 300(55) |
Armament | 1 x 2 Igla-1M SAM (32), 2 x 6 - 30/54 AK-630M, 2 x 22 - 140 MS-227 Ogon' RL |
Military load | 3 tanks or 8 AFV's or 360 troops or 150 t of cargo or 78 mines |
Electronic equipment | Lazur', MR-123-02 Vympel, Ekran-1 radars, MP-411 ECM suite |
Complement | 27 |
Soviet Project 1232.2. First craft was transferred by Russian Navy, second by Ukraine, two were built for Greece under identical project 12322E.
None.
No significant events.