Name | No | Yard No | Builder | Laid down | Launched | Comp. | Fate |
---|---|---|---|---|---|---|---|
Nordperd | E-35/E-171 | 109.01 | Peenewerft, Wolgast, East Germany | 26.1.1978 | 30.8.1978 | 3.10.1979 | stricken 10.1990, to Indonesia (Teluk Cirebon) |
Südperd | E-36/E-172 | 109.02 | Peenewerft, Wolgast, East Germany | 16.4.1978 | 30.10.1978 | 26.2.1980 | stricken 10.1990, to Indonesia (Teluk Sabang) |
Displacement standard, t | 1744 |
---|---|
Displacement full, t | 1950 |
Length, m | 90.7 |
Breadth, m | 11.1 |
Draught, m | 2.80 mean 3.40 max |
No of shafts | 2 |
Machinery | 2 61B diesels |
Power, h. p. | 12000 |
Max speed, kts | 18 |
Fuel, t | diesel oil |
Endurance, nm(kts) | 2450(14) |
Armament | 1 x 4 Fasta-4M SAM (16 9M32M), 2 x 2 - 57/50 AK-725, 2 x 2 - 25/82 2M-3M |
Military load | 650 t cargo or mines |
Electronic equipment | TSR-333, MR-302 Rubka, MR-105 Bars radars, 2x PK-16 decoy RL |
Complement | 35 |
Project 109, armed support ships on base of project 108 landing ships with the combat outfit reduced but with a 8t crane amidships.
None.
No significant events.
Many thanks to Wolfgang Stöhr for additional information on this page.