Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
HQ-261 | 261 | 040 | Almaz, St. Petersburg, Russia | 2001 | 18.7.2002 | 1.2003 | in service (2019) |
HQ-263 | 263 | 041 | Almaz, St. Petersburg, Russia | 2001 | 18.8.2002 | 1.2003 | in service (2019) |
HQ-264 | 264 | 045 | Almaz, St. Petersburg, Russia | 26.6.2009 | 12.11.2010 | 20.10.2011 | in service (2019) |
HQ-265 | 265 | 044 | Almaz, St. Petersburg, Russia | 26.6.2009 | 22.4.2011 | 20.10.2011 | in service (2019) |
HQ-266 | 266 | 420 | Vostochnaya Verf', Vladivostok, Russia | 22.7.2009 | 2011 | 26.10.2012 | in service (2019) |
HQ-267 | 267 | 421 | Vostochnaya Verf', Vladivostok, Russia | 22.7.2009 | 2011 | 26.10.2012 | in service (2019) |
Displacement standard, t | 333 |
---|---|
Displacement full, t | 375 |
Length, m | 43.0 pp 49.5 oa |
Breadth, m | 9.20 |
Draught, m | 2.63 |
No of shafts | 3 |
Machinery | 3 M-520 diesels |
Power, h. p. | 16200 |
Max speed, kts | 32 |
Fuel, t | diesel oil |
Endurance, nm(kts) | 2200(13) |
Armament | 1 x 2 Igla-1M SAM (16 Igla-1M), 1 x 1 - 76/59 AK-176M, 1 x 6 - 30/54 AK-630M, 2 x 1 - 14.5/93 |
Electronic equipment | Furuno FR-2150W, Mius, MR-123 Vympel-A radars, Sliabing ECM suite, 2x PK-16 decoy RL |
Complement | 28 |
Russian export project 10412 without ASW equipment. Steel hull with aluminium superstructure.
None.
No significant events.