
Support the project with paypal
| No | Name | Yard No | Builder | Laid down | Launched | Comm | Fate |
|---|---|---|---|---|---|---|---|
| TB9, 8.1918- CTB4 | Dahlgren, 8.1918- unnamed | 17 | Bath Iron Wks | 12/1897 | 29.5.1899 | 6/1900 | sold 7.1920 |
| TB10 | Craven | 18 | Bath Iron Wks | 12/1897 | 25.9.1899 | 6/1900 | target 11.1913 |
| Displacement normal, t | 146 |
|---|---|
| Displacement full, t | |
| Length, m | 46.1 |
| Breadth, m | 5.01 |
| Draught, m | 1.42 mean |
| No of shafts | 2 |
| Machinery | 2 VTE, 2 Normand boilers |
| Power, h. p. | 4200 |
| Max speed, kts | 31 |
| Fuel, t | coal 32 |
| Endurance, nm(kts) | |
| Armament | 4 x 1 - 37/40 Driggs-Schroeder heavy Mk I, 2 x 1 - 450 TT |
| Complement | 29 |
Authorised under the Act of 10.6.1896. Two funnels not far apart. Two single TT, aft and far aft.
None.
No significant events.

