NAVYPEDIA

Support the project with paypal


HOME
FIGHTING SHIPS OF THE WORLD
UNITED KINGDOM
ESCORTS
TYNE offshore patrol vessels (2003-2004)


Photo



Mersey 2008 Many thanks to Wolfgang Stöhr for additional information on this page.

Ships


Name No Yard No Builder Laid down Launched Comp Fate
Tyne P281 4303 Vosper-Thornycroft, Woolston 3.9.2001 29.4.2002 4.7.2003 stricken 5.2018
Severn P282 4304 Vosper-Thornycroft, Woolston 17.6.2002 4.12.2002 31.7.2003 stricken 10.2017
Mersey P283 4305 Vosper-Thornycroft, Woolston 16.12.2002 25.6.2003 26.3.2004 in service (2019)


Technical data


Displacement standard, t1670
Displacement full, t

1800

Length, m

73.6 pp 79.8 oa

Breadth, m

13.6

Draught, m

4.15

No of shafts

2

Machinery

2 MAN-Burmeister & Wain-Ruston 12RK270 diesels

Power, h. p.

11280

Max speed, kts

20

Fuel, t

diesel oil 325

Endurance, nm(kts)

5500(15)

Armament

1 x 1 - 20/85 GAM-B01, 2 x 1 - 7.6/90

Electronic equipment

2x Kelvin Hughes Nucleus-3 5000 ARPA radars

Complement

45 + 3 commandos



Standard scale images


<i>Tyne </i>2010
Tyne 2010


Graphics


<i>Mersey </i>2008 <i>Many thanks to Wolfgang Stöhr for additional information on this page.</i>
Mersey 2008 Many thanks to Wolfgang Stöhr for additional information on this page.


Project history

Ordered as replacements for the remaining Island-class offshore patrol ships in the fisheries protection role. The ships are RN crewed but owned by the contractor and leased to the Royal Navy for five-year periods, with options for a 10-year renewal, purchase, or return to the builder/owner. In 2010 the M.O.D. announced that the service was considering purchasing the first three units outright should funding become available. The ships are expected to operate for 320 days per year.

Two Halmatic Pacific 22 inspection RIBs are carried, and a 25-ton capacity crane is fitted to handle containerized disaster relief, antipollution, firefighting, rescue, and other modules. The hull was designed so that a section can be inserted amidships to accommodate additional crew and equipment, as was done for P 257. The use of flat-panel hull plating results in a considerable angled knuckle abreast the pilothouse. A helicopter deck capable of handling a Merlin could be added later.

Modernizations

None.

Naval service

No significant events.

Many thanks to Wolfgang Stöhr for additional information on this page.