NAVYPEDIA

Support the project with paypal


HOME
FIGHTING SHIPS OF THE WORLD
TAIWAN
COASTAL FORCES
FACG60 fast attack craft (missile) (2003-2011)


Photo



FACG60 2005

Ships


Name No Yard No Builder Laid down Launched Comm Fate
- FACG60   China SB, Kaohsiung 2.10.2001 3.10.2002 1.10.2003 in service (2019)
- FACG61   China SB, Kaohsiung 26.11.2007 6.11.2008 28.8.2009 in service (2019)
- FACG62   China SB, Kaohsiung 26.11.2007 6.11.2008 28.8.2009 in service (2019)
- FACG63   China SB, Kaohsiung 2008 25.2.2009 10.11.2009 in service (2019)
- FACG64   China SB, Kaohsiung 2008 25.2.2009 10.11.2009 in service (2019)
- FACG65   China SB, Kaohsiung 7.9.2008 22.5.2009 17.12.2009 in service (2019)
- FACG66   China SB, Kaohsiung 7.9.2008 22.5.2009 17.12.2009 in service (2019)
- FACG68   China SB, Kaohsiung 2008 8.7.2009 10.2.2010 in service (2019)
- FACG69   China SB, Kaohsiung 2008 8.7.2009 10.2.2010 in service (2019)
- FACG70   China SB, Kaohsiung 2008 2009 18.5.2010 in service (2019)
- FACG71   China SB, Kaohsiung 2008 2009 18.5.2010 in service (2019)
- FACG72   China SB, Kaohsiung 2009 2010 15.7.2010 in service (2019)
- FACG73   China SB, Kaohsiung 2009 2010 15.7.2010 in service (2019)
- FACG74   China SB, Kaohsiung 2009 2010 9/2010 in service (2019)
- FACG75   China SB, Kaohsiung 2009 2010 9/2010 in service (2019)
- FACG77   China SB, Kaohsiung 2009 2010 12.11.2010 in service (2019)
- FACG78   China SB, Kaohsiung 2009 2010 12.11.2010 in service (2019)
- FACG79   China SB, Kaohsiung 2009 2010 10.1.2011 in service (2019)
- FACG80   China SB, Kaohsiung 2009 2010 10.1.2011 in service (2019)
- FACG81   China SB, Kaohsiung 2010 2010 7.4.2011 in service (2019)
- FACG82   China SB, Kaohsiung 2010 2010 7.4.2011 in service (2019)
- FACG83   China SB, Kaohsiung 5.3.2010 8.10.2010 19.5.2011 in service (2019)
- FACG84   China SB, Kaohsiung 5.3.2010 8.10.2010 19.5.2011 in service (2019)
- FACG86   China SB, Kaohsiung 2010 2011 13.7.2011 in service (2019)
- FACG87   China SB, Kaohsiung 2010 2011 13.7.2011 in service (2019)
- FACG88   China SB, Kaohsiung 2010 2011 17.8.2011 in service (2019)
- FACG89   China SB, Kaohsiung 2010 2011 17.8.2011 in service (2019)
- FACG90   China SB, Kaohsiung 2010 2011 18.10.2011 in service (2019)
- FACG91   China SB, Kaohsiung 2010 2011 18.10.2011 in service (2019)
- FACG92   China SB, Kaohsiung 29.10.2010 30.5.2011 2.12.2011 in service (2019)
- FACG93   China SB, Kaohsiung 29.10.2010 30.5.2011 2.12.2011 in service (2019)


Technical data


Displacement standard, t

150

Displacement full, t

186

Length, m

34.2 pp 40.0 oa

Breadth, m

7.60

Draught, m

1.90

No of shafts

3

Machinery

3 MTU 16 V 4000 diesels

Power, h. p.

9800

Max speed, kts

33

Fuel, t

diesel oil

Endurance, nm(kts)

1150(22)

Armament

2 x 2 Hsiung Feng II SSM (4 Hsiung Feng II), 2 x 1 - 20/68 T75, 2 x 1 - 7.6/90

Electronic equipment

Selesmar, Dacheng radars, 2x AV-2 decoy RL, Dacheng CCS

Complement

14



Standard scale images


FACG60 2010
FACG60 2010


Graphics


FACG60<i> </i>2005
FACG60 2005


Project history

Program approved in 1996; designed as replacements for the Hai Ou class, but with only 30 to be built. Design, developed by the ROCN's Ship Development Center, employs stealth techniques to reduce radar and infrared signatures and was enlarged in 1997 from the original 34.5m, 150t concept. A new stand-alone fire-control system for the missiles, with a single display and command console, is employed. The antiship missiles are mounted in pairs, athwartships behind sloped bulwarks to reduce radar signature.

Modernizations

None.

Naval service

No significant events.

© Ivan Gogin, 2017-19