Serviola 2000
Name | No | Builder | Laid down | Launched | Comp | Fate |
Serviola | P71 | Bazán, Ferrol | 17/10/1989 | 10/5/1990 | 22/3/1991 | in service (2018) |
Centinela | P72 | Bazán, Ferrol | 19/1/1990 | 30/10/1990 | 24/9/1991 | in service (2018) |
Vigía | P73 | Bazán, Ferrol | 30/10/1990 | 12/4/1991 | 24/3/1992 | in service (2018) |
Atalaya | P74 | Bazán, Ferrol | 14/12/1990 | 22/11/1991 | 29/6/1992 | in service (2018) |
Displacement standard, t |
820 |
Displacement full, t |
1150 |
Length, m |
63.0 wl 68.7 oa |
Breadth, m |
10.4 |
Draught, m |
3.40 |
No of shafts |
2 |
Machinery |
2 MTU-Bazán 16V956 TB91 diesels |
Power, h. p. |
7500 |
Max speed, kts |
20 |
Fuel, t |
diesel oil 247 |
Endurance, nm(kts) |
8000(12) |
Armament |
1 x 1 - 76/50 Mk 26, 2 x 1 - 12.7/90, helicopter deck |
Sensors |
P71: Decca 2459, Decca 2690 radars, Alcor-C e/o director, ULQ-13 ECM suite, Hispano Mini CCS P72, 74: Decca 2459, Decca 2690 radars, MSP4000 e/o director, Hispano Mini CCS P73: Decca 2459, Decca 2690 radars, Alcor-C e/o director, Hispano Mini CCS |
Complement |
42 |
Ship project history: Ordered in 1989 for use as offshore patrol vessels. A planned fifth unit was not ordered. Design based on the Águila class for the Mexican Navy. Originally referred to as the Milano class while under construction. Platform for an AB-212-sized helicopter but no hangar. Carry two rigid inflatable inspection boats and have three 80-m³/hr firefighting pumps. The 76mm gun, from surplus stocks, is controlled by an Alcor-C optronic director or locally.
Modernizations: None.
Naval service: No significant events.
Atalaya 2003
© Ivan Gogin, 2017-18