Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate | Modification |
---|---|---|---|---|---|---|---|---|
К-535 Юрий Долгорукий [K-535 Yuriy Dolgorukiy] | 838 | 201 | Severnoye Mashinostroitelnoye Predpriyatiye, Severodvinsk | 2.11.1996 | 12.2.2008 | 29.12.2012 | in service (2019) | Project 955 |
К-550 Александр Невский [K-550 Aleksandr Nevskiy] | 819 | 202 | Severnoye Mashinostroitelnoye Predpriyatiye, Severodvinsk | 19.3.2004 | 2.12.2010 | 23.12.2013 | in service (2019) | Project 955 |
К-551 Владимир Мономах [K-551 Vladimir Monomakh] | 817 | 203 | Severnoye Mashinostroitelnoye Predpriyatiye, Severodvinsk | 19.3.2006 | 30.12.2012 | 10.12.2014 | in service (2019) | Project 955 |
Князь Владимир [Knyaz' Vladimir] | 204 | Severnoye Mashinostroitelnoye Predpriyatiye, Severodvinsk | 30.7.2012 | 17.11.2017 | 2019 | building (2019) | Project 955A | |
Князь Олег [Knyaz' Oleg] | 205 | Severnoye Mashinostroitelnoye Predpriyatiye, Severodvinsk | 27.7.2014 | 2019 | 2021 | building (2019) | Project 955A | |
Генералиссимус Суворов [Generalissimus Suvorov] | 206 | Severnoye Mashinostroitelnoye Predpriyatiye, Severodvinsk | 26.12.2014 | 2019 | 2021 | building (2019) | Project 955A | |
Император Александр III [Imperator Aleksandr III] | 207 | Severnoye Mashinostroitelnoye Predpriyatiye, Severodvinsk | 18.12.2015 | 2020 | 2022 | building (2019) | Project 955A | |
Князь Пожарский [Knyaz' Pozharskiy] | 208 | Severnoye Mashinostroitelnoye Predpriyatiye, Severodvinsk | 23.12.2016 | 2021 | 2023 | building (2019) | Project 955A |
Displacement standard, t |
|
---|---|
Displacement normal, t | 14950 / 19700 |
Length, m | 170.0 |
Breadth, m | 13.5 |
Draught, m | 9.00 |
No of shafts | 1 |
Machinery | 1 OK-9VM geared steam turbines unit, 1 OK-650B nuclear reactor |
Power, h. p. | 49000 |
Max speed, kts | 15 / 20 |
Fuel, t | nuclear |
Endurance, nm(kts) | practically unlimited |
Armament | 16 R-30 Bulava SLBM (16 R-30 (3M30)), 4 - 533 TT (bow, 12, inc. URPK-6 Vodopad-PL SSM/ASuM (83R, 84R)), 1 x 1 Igla SAM (8 9M39) |
Electronic equipment | pr. 955: R-43 radar, MGK-600B Irtysh-Amfora-B-055A sonar suite, ECM suite, 6 REPS-324 Shlagbaum decoy launchers, MVU-132 Omnibus-BDRM CCS pr. 955A: R-43M-955A radar, MGK-600B Irtysh-Amfora-B-055A sonar suite, MG-70, Zhgut-M, Vint-M sonars, Bukhta ECM suite, 6 REPS-324 Shlagbaum decoy launchers, Okrug CCS |
Complement | 102 |
Diving depth operational, m | 300 |
Work on the first submarine of project 955 Borey at first was extremely slow with only 2-3% completed by mid-1998, at which time construction was halted. The associated Grom missile program was cancelled early 1998, and the design of submarine had to be recast to accommodate the smaller, newly developed Bulava missile. The missile system was declared operational in December 2011.
Detachable crew rescue chamber is built in the sail. The hullform incorporates a Double Hogner stern, as in the projet 667BDRM SSBNs. This is the first Russian SSBN design fitted with a pumpjet propulsor. The hulls of first three submarines include pressure hull sections from the unfinished pr. 971 submarines, laid down earlier. Project 955A submarines are built under the expanded design with new electronics and 2 Modul-D multipurpose vertical launchers.
None.
No significant events.