Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
ضحى [Doha] | Fincantieri, Muggiano/Riva Trigoso, Italy | 27.11.2018 | 2020 | 2021 | building (2020) | ||
ii | Fincantieri, Muggiano/Riva Trigoso, Italy | 2020 | 2021 | 2022 | ordered (2020) | ||
iii | Fincantieri, Muggiano/Riva Trigoso, Italy | 2021 | 2022 | 2023 | ordered (2020) | ||
iv | Fincantieri, Muggiano/Riva Trigoso, Italy | 2022 | 2023 | 2024 | ordered (2020) |
Displacement standard, t | |
---|---|
Displacement full, t | 3250 |
Length, m | 107.0 |
Breadth, m | 14.7 |
Draught, m | 4.20 |
No of shafts | 2 |
Machinery | 4 MAN 22/38D diesels |
Power, h. p. | 42900 |
Max speed, kts | 28 |
Fuel, t | diesel oil |
Endurance, nm(kts) | 3500(15) |
Armament | 2 x 4 MM40 Exocet SSM (8 MM40 Block 3), 2 x 8 Aster 30 SAM (16 ASter 30), 1 x 21 RAM SAM (21 RIM-116), 1 x 1 - 76/62 Leonardo-OTO Super Rapid, 2 x 1 - 30/82 Marlin WS-30, 1 helicopter (NFH90) |
Electronic equipment | Kronos Grand 3D, NA-30S Mk 2, nav. radars, Medusa, SASS IRST e/o systems, Black Snake, Thesan sonars, Virgilius ECM suite, 2x Sylena Mk 2 decoy RL, Athena CCS |
Complement | 112 |
ABM design of Fincantieri, ordered in 2016.
None.
No significant events.