
 Support the project with paypal
Support the project with paypal
| Name | No | Yard No | Builder | Laid down | Launched | Comm | Fate | 
|---|---|---|---|---|---|---|---|
| ADRI LI | PT Daya Radar Utama, Lamongan | 23.3.2019 | 2019 | building (2019) | |||
| ADRI LII | PT Daya Radar Utama, Lamongan | 2019 | 2020 | building (2019) | 
| Displacement standard, t | 1500dwt | 
|---|---|
| Displacement full, t | ~4000 | 
| Length, m | 99.2 | 
| Breadth, m | 16.4 | 
| Draught, m | |
| No of shafts | 2 | 
| Machinery | 2 diesels | 
| Power, h. p. | |
| Max speed, kts | 14 | 
| Fuel, t | diesel oil | 
| Endurance, nm(kts) | |
| Armament | none | 
| Military load | tanks | 
| Electronic equipment | radar | 
| Complement | 
Logistic landing craft. Has bow ramp and can be beached.
None.
No significant events.

