
Support the project with paypal

| Name | No | Yard No | Builder | Laid down | Launched | Comp. | Fate |
|---|---|---|---|---|---|---|---|
| Hoyerswerda | 611 | 331 | Peenewerft, Wolgast | 25.11.1974 | 1.7.1975 | 12.11.1976 | stricken 1990, to Indonesia (Teluk Gilimanuk) |
| Hagenow | 612/632 | 332 | Peenewerft, Wolgast | 7.3.1975 | 19.12.1975 | 1.12.1976 | stricken 1990, to Indonesia (Teluk Celukan Bawang) |
| Frankfurt/Oder | 613 | 333 | Peenewerft, Wolgast | 10.6.1975 | 2.1.1976 | 2.2.1977 | stricken 1990, to Indonesia (Teluk Cendrawasih) |
| Eberswalde/Finow | 614/634 | 334 | Peenewerft, Wolgast | 10.9.1975 | 15.7.1976 | 28.5.1977 | stricken 1990, to Indonesia (Teluk Berau) |
| Lübben | 631/632 | 335 | Peenewerft, Wolgast | 11.12.1975 | 2.10.1976 | 15.3.1978 | stricken 1990, to Indonesia (Teluk Peleng) |
| Schwerin | 632/612 | 336 | Peenewerft, Wolgast | 17.3.1976 | 18.1.1977 | 19.10.1977 | stricken 1990, to Indonesia (Teluk Sibolga) |
| Neubrandenburg | 633 | 337 | Peenewerft, Wolgast | 21.8.1976 | 6.4.1977 | 28.12.1977 | stricken 1990, to Indonesia (Teluk Mando) |
| Cottbus | 634/614 | 338 | Peenewerft, Wolgast | 22.11.1976 | 10.6.1977 | 26.5.1978 | stricken 1990, to Indonesia (Teluk Hading) |
| Anklam | 635 | 339 | Peenewerft, Wolgast | 21.2.1977 | 22.9.1977 | 14.7.1978 | stricken 1990, to Indonesia (Teluk Parigi) |
| Schwedt | 636 | 340 | Peenewerft, Wolgast | 5.5.1977 | 27.12.1977 | 7.9.1979 | stricken 1990, to Indonesia (Teluk Lampung) |
| Eisenhüttenstadt | 615 | 341 | Peenewerft, Wolgast | 18.8.1977 | 8.3.1978 | 4.1.1979 | stricken 1990, to Indonesia (Teluk Jakarta) |
| Grimmen | 616 | 342 | Peenewerft, Wolgast | 2.11.1977 | 30.5.1978 | 15.6.1979 | stricken 1990, to Indonesia (Teluk Sangkulirang) |
| Displacement standard, t | 1744 |
|---|---|
| Displacement full, t | 1950 |
| Length, m | 90.7 |
| Breadth, m | 11.1 |
| Draught, m | 2.80 mean 3.47 max |
| No of shafts | 2 |
| Machinery | 2 61B diesels |
| Power, h. p. | 12000 |
| Max speed, kts | 18 |
| Fuel, t | diesel oil |
| Endurance, nm(kts) | 2450(14) |
| Armament | 1 x 4 Fasta-4M SAM (16 9M32M), 2 x 2 - 57/50 AK-725, 2 x 2 - 30/71 AK-230, 2 x 40 -122 A-215 Grad-M RL |
| Military load | 12 tanks or 600 t cargo, 100 troops |
| Electronic equipment | TSR-333, MR-302 Rubka, MR-105 Bars radars, 2x PK-16 decoy RL |
| Complement | 48 |
Project 108, largest ships in the Volksmarine. Fitted with a bow ramp but had no bow doors and no stern door or ramp.
None
No significant events.
Many thanks to Wolfgang Stöhr for additional information on this page.

