Name | No | Yard No | Builder | Laid down | Launched | Comp | Fate |
---|---|---|---|---|---|---|---|
远征 201 [Yuangzheng 201] | 201 | Wuchang, Wuhan | 2008 | 9.9.2010 | 16.10.2012 | in service (2019) |
Displacement standard, t |
|
---|---|
Displacement normal, t | 3800 / 6630 |
Length, m | 92.5 |
Breadth, m | 10.0 hull |
Draught, m | 6.85 |
No of shafts | 1 waterjet |
Machinery | diesel-generators, 1 electric motor |
Power, h. p. | |
Max speed, kts | 10 / 14 |
Fuel, t | diesel oil |
Endurance, nm(kts) | |
Armament | 2 JL-2 (or 1 - 3 other models for test) SLBM (2), 1 x 4 CruM/SSM/ASuM (VLS, 4), 1 - 650 TT (bow), 1 - 533 TT (bow) |
Electronic equipment | radar, sonars |
Complement | 88 + up to 100 civil specialists |
Diving depth operational, m | 160 |
Trials submarine, replacement for Russian-built project 629. SLBM tubes are placed in the sail, VLS for cruising and anti-ship missiles arranged in the forward hull part. Its planned that during wartime this submarine can operate as combat unit with JL-2 missiles.
None.
No significant events.
© Ivan Gogin, 2017-19