NAVYPEDIA

Support the project with paypal


HOME
FIGHTING SHIPS OF THE WORLD
CHINA
SUBMARINES
CHANGCHENG 330 submarines (project 039A, 2005-2012), CHANGCHENG 338 submarines (project 039B, 2012-2015)


Photo



2008

Ships


Name No Builder Laid down Launched Comp Fate Modification
长城 330 [Changcheng 330] 330 Wuchang, Wuhan   31.5.2004 4/2005 in service (2019) Type 039A
长城 331 [Changcheng 331] 331 Wuchang, Wuhan   31.8.2007 2009 in service (2019) Type 039A
长城 332 [Changcheng 332] 332 Wuchang, Wuhan   11/2007 2009 in service (2019) Type 039A
长城 333 [Changcheng 333] 333 Wuchang, Wuhan   4/2008 2010 in service (2019) Type 039A
长城 334 [Changcheng 334] 334 Wuchang, Wuhan   10.10.2008 2011 in service (2019) Type 039B
长城 335 [Changcheng 335] 335 Wuchang, Wuhan   3.10.2010 2011 in service (2019) Type 039B
长城 336 [Changcheng 336] 336 Wuchang, Wuhan   11/2010 2012 in service (2019) Type 039B
长城 337 [Changcheng 337] 337 Wuchang, Wuhan   16.12.2010 2012 in service (2019) Type 039B
长城 338 [Changcheng 338] 338 Jiangnan, Changxing   7.6.2011 2012 in service (2019) Type 039B
长城 339 [Changcheng 339] 339 Wuchang, Wuhan   29.7.2011 2012 in service (2019) Type 039B
长城 340 [Changcheng 340] 340 Wuchang, Wuhan   28.8.2011 2012 in service (2019) Type 039B
长城 341 [Changcheng 341] 341 Jiangnan, Changxing   26.11.2011 2012 in service (2019) Type 039B
长城 342 [Changcheng 342] 342 Wuchang, Wuhan   10.12.2013 2015 in service (2019) Type 039B
长城 343 [Changcheng 343] 343 Wuchang, Wuhan   25.4.2014 2016 in service (2019) Type 039B
长城 344 [Changcheng 344] 344 Wuchang, Wuhan   12/2016 2017 in service (2019) Type 039B
长城 345 [Changcheng 345] 345 Jiangnan, Changxing   2018 2019 building (2019) Type 039B
长城 346 [Changcheng 346] 346 Jiangnan, Changxing   2018 2019 building (2019) Type 039B
长城 347 [Changcheng 347] 347 Wuchang, Wuhan   2018 2019 building (2019) Type 039B


Technical data


Displacement standard, t

 

Displacement normal, t

2725 / 3600

Length, m

type 039A: 72.0

type 039B: 74.9

Breadth, m

8.40 hull

Draught, m

5.50

No of shafts

1

Machinery

4 MTU 16V396 SE 83/84 diesel-generators / AIP, 1 electric motor

Power, h. p.

6092 / 220

Max speed, kts

16 / 23

Fuel, t

diesel oil

Endurance, nm(kts)

8000(16) / 800(4)

Armament

type 039A: 6 - 533 TT (bow, 18, inc. Yin Ji-82 SSM (4 C-602) or 24-36 mines)

type 039B: 1 x 10 YJ-81 SSM (VLS, 10 C-801) (may be), 6 - 533 TT (bow, 18, inc. Yin Ji-82 SSM (4 C-602) or 24-36 mines)

Electronic equipment

type 039A: type 359 radar, H/SQG-4 sonar suite (TSM2233 Eledone, TSM-2255, SQB-2 sonars), Type 921-A (SRW209) ECM suite, CCS

type 039B: type 359 radar, H/SQG-4 sonar suite (TSM2233 Eledone, TSM-2255, SQB-2 sonars), H/SQC-207 sonar, Type 921-A (SRW209) ECM suite, CCS

Complement

58

Diving depth operational, m

300



Standard scale images


<i>Changcheng 330 </i>2010
Changcheng 330 2010


Graphics


2008
2008


Project history

Type 039G with air-independent power plant. Also submarines presumably can launch 3M54 Club SSMs and YJ-18 supersonic SSMs (currently in development). Type 039B differs from the type 039A by having flank sonar array and (may be) VLS. Building of 20 type 039C submarines is planned.

Modernizations

None.

Naval service

No significant events.

© Ivan Gogin, 2017-19